The Capital Projects Division manages key construction projects for the City of Kansas City, Mo. Public Works Department. Capital Projects staff are at the forefront of Kansas City’s construction renaissance, bringing process improvements and standardized practices to the management of street, bridge and building projects throughout the City. Personnel include project managers; construction inspectors; right-of-way, relocation and utility specialists; and finance and administrative professionals.

View the Major Streets Plan 

Contact Capital Projects

414 E. 12th Street, 18th floor
Kansas City, MO 64104
Phone: (816) 513-2739
Fax: (816) 513-2523

Projects Map

Project Description:

Improvements are needed to the segment of Red Bridge Road between Holmes Road and Wornall Road due to traffic congestion and long wait times during peak hours at the Red Bridge and Wornall intersection and inefficient flow of traffic at non-peak hours. Factors contributing to this are outdated traffic signals, in addition to an insufficient and unbalanced lane configuration at the intersection. Additionally, sight line issues make turning right on a red light difficult and dangerous.

Improvements are also needed for the safety of pedestrians and bicyclists on this segment of the corridor. Currently, this section lacks accessibility and connectivity for bicyclists and pedestrians, as well as a continuous walkable route.  Proposed improvements include:

  • New traffic signals at Wornall and Holmes Road
  • A 5-foot sidewalk on the north side of Red Bridge Road
  • A 10-foot multi-use trail on the south side of Red Bridge Road
  • Additional traffic lanes on Red Bridge Road
  • New enclosed storm drainage system
  • New curb and gutter
  • New street lighting
  • Decorative plantings and storm water management installations

Traffic Impact:                                     

This project is currently under design.   Red Bridge Road is expected to remain open during construction.

Project Timeline: 

Current status:  under design. Construction is expected to begin in spring 2020 and be completed in fall 2021.

Public Engagement: 

Public Meeting is scheduled for 9/26 from 5:00 pm to 6:30 pm at KC Autism Training Center, Multi-Purpose Room, 10842 McGee St., Kansas City, Missouri 64114

Project Contacts:    

James Wang, Project Manager

Parks and Recreation Department— KCMO

Phone: (816) 513-7622