    63rd from Main to Wornall facility image 

    Project Description:

    The project consists of designing improvements along 63rd Street from Wornall to Troost. The project implements concept level plans developed as part of the 63rd Street PSP Study completed in 2020. The first phase of the improvements will be along 63rd Street between Wornall Road and Main Street, and Brookside Boulevard, between 62nd Terrace and Meyer Boulevard.

    Project Timeline:  

    • Work will take place in two phases, with concrete curbs, sidewalks and driveways installed prior to resurfacing and striping.
    • The North-South Trolley Track Trail is under design
    • Pedestrian improvements at Meyer and Wyandotte and Meyer and the Trolley Track Trail are under design
    • Project completion Fall 2023

    Public Engagement

    If you want to give feedback about this project, you can fill out this survey!

    Documents

    63rd Street Master Plan Presentation
    63rd Street - Wornall to Main presentation
    2019 63rd Street Master Plan

    Sample sections

     

    Project Contact

    Randy Alewine, Project Manager

    (816) 513-2589

    Return to full list >>

    Free viewers are required for some of the attached documents.
    They can be downloaded by clicking on the icons below.

    Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

     

    Capital Projects can be filtered by project name, department, and address.

    Project Contacts

    District 1 & District 2 
    Todd LaTorella
    Assistant City Engineer, District Engineer
    (816) 513-0803

    District 3 & District 5
    Amy Bunnell
    District Engineer
    (816) 513-2748

    District 4 & District 6
    Randy Alewine
    District Engineer
    (816) 513-2589

    City Engineer
    Nicolas Bosonetto
    (816) 513-2746

    • Capital Projects Fountain

      Kansas City identifies potential connector streets in a "Major Street Plan" that is updated every few years